Show simple item record

dc.contributor.authorNaai-Jung Shih
dc.contributor.authorPing-Hung Wang
dc.date.accessioned2017-05-08T21:22:06Z
dc.date.available2017-05-08T21:22:06Z
dc.date.copyrightSeptember 2004
dc.date.issued2004
dc.identifier.other%28asce%291076-0431%282004%2910%3A3%2898%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/48699
dc.description.abstractThis research compares the work process at a construction site with the original construction schedule using point-cloud records that were retrieved using a long-range 3D laser scanner. The comparison was used to quantify the differences as a reference for the verification and modification of the original building design. This study compared 4D computer models with 3D clouds of a campus building. The differences could easily be identified from the perspectives and elevations of different views. To determine the degree of progress more precisely, a slice of clouds was defined to show the differences when compared with a cross section of a computer model. The format of the point cloud provided a new way to inspect construction progress.
dc.publisherAmerican Society of Civil Engineers
dc.titlePoint-Cloud-Based Comparison between Construction Schedule and As-Built Progress: Long-Range Three-Dimensional Laser Scanner’s Approach
dc.typeJournal Paper
dc.journal.volume10
dc.journal.issue3
dc.journal.titleJournal of Architectural Engineering
dc.identifier.doi10.1061/(ASCE)1076-0431(2004)10:3(98)
dc.treeJournal of Architectural Engineering:;2004:;Volume ( 010 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record