• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Architectural Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Architectural Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Stakeholder Management during Project Inception: Strategic Needs Analysis

    Thumbnail
    View/Open
    %28asce%291076-0431%282004%2910%3A1%2822%29.pdf (1.132Mb)
    Date
    2004
    Author
    Jim Smith
    Peter E. D. Love
    Metadata
    Show full item record
    Abstract
    The project inception stage has been the focus of intense research activity for a number of years. The need to establish the project parameters and performance requirements has been an imperative in many organizations. Predesign processes and activities are being instituted that work through client strategic and organizational issues, needs, and requirements before the design team is involved. The participation of stakeholders in predesign workshops is a common feature of these project inception approaches. These approaches prepare a clear and workable statement of the project requirements in performance terms that the client group has agreed and committed itself to. This document can then provide a sound basis for the development of the design. One approach to these early stages of the project is
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/48683
    Collections
    • Journal of Architectural Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV