Show simple item record

dc.contributor.authorNancy L. Holland
dc.contributor.authorDana Hobson Jr
dc.date.accessioned2017-05-08T21:21:53Z
dc.date.available2017-05-08T21:21:53Z
dc.date.copyrightJune 1999
dc.date.issued1999
dc.identifier.other%28asce%291076-0431%281999%295%3A2%2849%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/48566
dc.description.abstractIn many instances, the architect/engineer is responsible for the drafting of construction contracts. The importance of the drafter's clearly defining direct and indirect costs for contract items receiving cost reimbursement is reinforced by this survey of contractors. The survey asks contractors to classify a list of 44 items as their company would, with respect to project and home-office overhead and direct and indirect costs. The results of the survey indicate a lack of standard usage of these terms by industry. The survey also is used to investigate the manner in which contractors allocate home-office overhead to contracts.
dc.publisherAmerican Society of Civil Engineers
dc.titleIndirect Cost Categorization and Allocation by Construction Contractors
dc.typeJournal Paper
dc.journal.volume5
dc.journal.issue2
dc.journal.titleJournal of Architectural Engineering
dc.identifier.doi10.1061/(ASCE)1076-0431(1999)5:2(49)
dc.treeJournal of Architectural Engineering:;1999:;Volume ( 005 ):;issue: 002
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record