Show simple item record

dc.contributor.authorRoberto Pietroforte
dc.date.accessioned2017-05-08T21:21:49Z
dc.date.available2017-05-08T21:21:49Z
dc.date.copyrightJune 1997
dc.date.issued1997
dc.identifier.other%28asce%291076-0431%281997%293%3A2%2870%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/48512
dc.description.abstractIn modern construction the timely and successful completion of shop drawings is critical for project performance. By containing specific instructions about the fabrication, assembly, and erection of a building component, these documents are the main interface between the end product described in the working drawings and specifications and its physical realization. The paper describes the lengthy engineering process of a thin-stone veneered cladding system of an office tower, namely the generation and review of its shop drawings and the verification of their design contents through the testing of a full size mock-up. Current standard contractual agreements and graphic representational protocols do not fully reflect the needs of modern construction. Tridimensional and time-scaled representations would be beneficial for the early consideration of the geometric boundaries of components, their assembly and erection requirements, and for the solution of trade interfaces. New communication technologies that allow real-time negotiation of the shop drawings' contents among project participants are needed for shortening the review process of these documents.
dc.publisherAmerican Society of Civil Engineers
dc.titleShop Drawing Process of Stone Veneered Cladding Systems
dc.typeJournal Paper
dc.journal.volume3
dc.journal.issue2
dc.journal.titleJournal of Architectural Engineering
dc.identifier.doi10.1061/(ASCE)1076-0431(1997)3:2(70)
dc.treeJournal of Architectural Engineering:;1997:;Volume ( 003 ):;issue: 002
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record