Show simple item record

dc.contributor.authorMing Lu
dc.contributor.authorSze-Chun Lau
dc.contributor.authorSamuel Ariaratnam
dc.date.accessioned2017-05-08T21:21:34Z
dc.date.available2017-05-08T21:21:34Z
dc.date.copyrightJune 2009
dc.date.issued2009
dc.identifier.other%28asce%291076-0342%282009%2915%3A2%28133%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/48368
dc.publisherAmerican Society of Civil Engineers
dc.titleDiscussion of “Productivity Study of Microtunneling Pipe Installation Using Simulation” by Roy Yu Luo and Mohammad Najafi
dc.typeJournal Paper
dc.journal.volume15
dc.journal.issue2
dc.journal.titleJournal of Infrastructure Systems
dc.identifier.doi10.1061/(ASCE)1076-0342(2009)15:2(133)
dc.treeJournal of Infrastructure Systems:;2009:;Volume ( 015 ):;issue: 002
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record