Show simple item record

dc.contributor.authorZiad S. Nakat
dc.contributor.authorSamer M. Madanat
dc.date.accessioned2017-05-08T21:21:31Z
dc.date.available2017-05-08T21:21:31Z
dc.date.copyrightSeptember 2008
dc.date.issued2008
dc.identifier.other%28asce%291076-0342%282008%2914%3A3%28185%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/48338
dc.description.abstractIn this paper we present the development of an empirical pavement overlay crack initiation model using condition survey data for the highway system in the state of Washington. We use a semiparametric Cox model and show that its hazard function represents the sample hazard function, which follows a bathtub shape. This is a shape that commonly used parametric models cannot predict. Empirical data complications, such as the endogeneity of overlay design variables and data censoring, are corrected for using appropriate econometric techniques. Our research shows that a specification that captures the main factors responsible for the overlay crack initiation process, combined with careful analysis of the data, can produce models of sufficient realism for maintenance and rehabilitation action selection purposes.
dc.publisherAmerican Society of Civil Engineers
dc.titleStochastic Duration Modeling of Pavement Overlay Crack Initiation
dc.typeJournal Paper
dc.journal.volume14
dc.journal.issue3
dc.journal.titleJournal of Infrastructure Systems
dc.identifier.doi10.1061/(ASCE)1076-0342(2008)14:3(185)
dc.treeJournal of Infrastructure Systems:;2008:;Volume ( 014 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record