Show simple item record

dc.contributor.authorMitsuru Jido
dc.contributor.authorToshimori Otazawa
dc.contributor.authorKiyoshi Kobayashi
dc.date.accessioned2017-05-08T21:21:31Z
dc.date.available2017-05-08T21:21:31Z
dc.date.copyrightJune 2008
dc.date.issued2008
dc.identifier.other%28asce%291076-0342%282008%2914%3A2%28150%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/48334
dc.description.abstractThis paper focuses upon the optimal repair and inspection policies of infrastructure under uncertainty in the facility deterioration process. It is supposed that the condition of the facility, which is defined in continuous state, can only be observed by inspection. The optimal impulse control problem is formulated to find out the optimal timing for inspection and repairing so as to minimize the expected life-cycle costs, including the repairing cost, user’s cost, and inspection cost. The state-dependent rules are presented to determine the optimal timing for inspection and repairing based upon the observation of condition state by solving the second-order Fredholm integral equation. The paper concludes with numerical examples, for illustration.
dc.publisherAmerican Society of Civil Engineers
dc.titleOptimal Repair and Inspection Rules under Uncertainty
dc.typeJournal Paper
dc.journal.volume14
dc.journal.issue2
dc.journal.titleJournal of Infrastructure Systems
dc.identifier.doi10.1061/(ASCE)1076-0342(2008)14:2(150)
dc.treeJournal of Infrastructure Systems:;2008:;Volume ( 014 ):;issue: 002
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record