Example of a Hybrid Life-Cycle Assessment of Construction Processes
Date
2006Author
Melissa Bilec
Robert Ries
H. Scott Matthews
Aurora L. Sharrard
Metadata
Show full item recordAbstract
Design and construction industries, along with owners, have an increasing interest in and responsibility for the environmental impacts of buildings. Since the environmental impacts of a building’s life cycle are considerable, quantification of all phases is important, especially the construction phase, which is often glossed over. This research focuses on the construction phase of a building project. Generally, the life-cycle inventory created in performing a life-cycle assessment (LCA) is developed using either a process or input–output approach; however, both techniques have distinct advantages and disadvantages. A hybrid approach combining both methods’ advantages has been proposed and will be demonstrated. Existing hybrid models are reviewed, along with a recommendation of a hybrid model for construction. A preliminary case study of a precast concrete parking garage’s construction using hybrid LCA methodology is presented. Preliminary investigations indicate transportation, equipment activity, and support functions have the largest effects on the environment.