• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Scheduling Inspection and Renewal of Large Infrastructure Assets

    Thumbnail
    View/Open
    %28asce%291076-0342%282001%297%3A4%28136%29.pdf (178.0Kb)
    Date
    2001
    Author
    Yehuda Kleiner
    Metadata
    Show full item record
    Abstract
    A decision framework is introduced to assist municipal engineers and planners to optimize decisions regarding the renewal of large infrastructure assets such as water transmission pipes, trunk sewers, or other assets with high costs of failure, inspection, and condition assessment. The proposed decision framework identifies a need for immediate intervention or, alternatively, enables optimization of the scheduling of the next inspection and condition assessment. The deterioration of the asset is modeled as a semi-Markov process and is thereby discretized into condition states. The waiting times in each state are assumed to be random variables with “known” probability distributions. If pertinent data are scarce (as is typical in most municipalities) these probability distributions can be initially derived based on expert opinion. These distributions will then be continually updated as observed deterioration data are collected over time. Monte Carlo simulation is used to calculate the distributions of the cumulative waiting times. Conditional survival probabilities are used to compile age-dependent transition probability matrices in the various states. The expected discounted total cost associated with an asset (including cost of intervention, inspection, and failure) is computed as a function of time. The time to schedule the next inspection/condition assessment is when the total expected discounted cost is minimum. Immediate intervention should be planned if the time of minimum cost is less than a threshold period (2 to 3 years) away. A computer program is prepared for demonstration and proof of concept. The decision framework lends itself to a computer application fairly easily. Although usable in its current form, this paper identifies some issues that require as yet unavailable data as well as more research in order to develop the framework into a comprehensive application tool.
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/48145
    Collections
    • Journal of Infrastructure Systems

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV