Show simple item record

dc.contributor.authorXue-qing Zhang
dc.contributor.authorMohan M. Kumaraswamy
dc.date.accessioned2017-05-08T21:21:12Z
dc.date.available2017-05-08T21:21:12Z
dc.date.copyrightMarch 2001
dc.date.issued2001
dc.identifier.other%28asce%291076-0342%282001%297%3A1%2818%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/48130
dc.description.abstractContinuous rapid economic growth in the past two decades places heavy demands on infrastructure facilities in China, which in turn provides attractive but often challenging development opportunities for foreign investors. BOT (build-operate-transfer) type project financing arrangements, such as joint venture BOT, sole proprietorship BOT, build-transfer-operate, and transfer-operate-transfer have been explored, with a number of projects successfully developed in diverse industries. Drawing examples from key landmark projects, this paper provides an overview and analysis of such developments. It provides pointers to improve procurement processes and timely insights into relevant Chinese initiatives, legal structures, foreign investment protocols, various project-financing models, tendering systems, specific procurement procedures, and particular challenges facing BOT-based approaches in China.
dc.publisherAmerican Society of Civil Engineers
dc.titleBOT-Based Approaches to Infrastructure Development in China
dc.typeJournal Paper
dc.journal.volume7
dc.journal.issue1
dc.journal.titleJournal of Infrastructure Systems
dc.identifier.doi10.1061/(ASCE)1076-0342(2001)7:1(18)
dc.treeJournal of Infrastructure Systems:;2001:;Volume ( 007 ):;issue: 001
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record