Show simple item record

dc.contributor.authorPiyush Tiwari
dc.contributor.authorKirit Parikh
dc.contributor.authorJyoti Parikh
dc.date.accessioned2017-05-08T21:21:09Z
dc.date.available2017-05-08T21:21:09Z
dc.date.copyrightSeptember 1999
dc.date.issued1999
dc.identifier.other%28asce%291076-0342%281999%295%3A3%28102%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/48093
dc.description.abstractIn a housing market model, the supply of housing, particularly new houses, is usually treated in a very cursory fashion, with new housing being regarded as homogeneously good and building cost function defined as a function of capital and labor costs. This paper formally recognizes heterogeneity in a housing model and introduces engineering design parameters in building cost function. Using structural engineering concepts, an engineering cost function is derived in terms of design parameters. A multiobjective compromise optimization algorithm is suggested to choose from various building cost functions. An empirical application of this method is demonstrated by solving the production function of a modular room 3.5 m × 3.5 m in area and 3.14 m in height.
dc.publisherAmerican Society of Civil Engineers
dc.titleStructural Design Considerations in House Builders' Model: Optimization Approach
dc.typeJournal Paper
dc.journal.volume5
dc.journal.issue3
dc.journal.titleJournal of Infrastructure Systems
dc.identifier.doi10.1061/(ASCE)1076-0342(1999)5:3(102)
dc.treeJournal of Infrastructure Systems:;1999:;Volume ( 005 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record