• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Development of Prototype Highway Asset Management System

    Thumbnail
    View/Open
    %28asce%291076-0342%281999%295%3A2%2861%29.pdf (291.0Kb)
    Date
    1999
    Author
    Nasir G. Gharaibeh
    Michael I. Darter
    Donald R. Uzarski
    Metadata
    Show full item record
    Abstract
    A prototype methodology for integrating highway infrastructure management activities has been developed. This paper describes the analytical procedures and data integration and presentation methods as well as the geographic information system- (GIS-) based software system that ties together and implements the data and management procedures. Together these elements comprise the new methodology. There are four major areas of integration considered in the methodology: (1) Integrated computerized system; (2) network-level integration; (3) project-level integration; and (4) multiple performance measures. The network-level integration involves performing trade-off analysis to select candidate projects from various highway infrastructure components. The project-level integration includes identifying adjacent improvement projects from various infrastructure components that can be implemented simultaneously to reduce traffic disruptions. The project-level integration is performed in a spatial manner using GIS capabilities. The integrated system approach developed in this study for the management of highway assets was applied to five infrastructure components (pavements, bridges, culverts, intersections, and signs) of the state highway system in Champaign County in central Illinois. The sample highway application showed that coordinating project implementation is beneficial for highway agencies and users. It reduces disruption to normal traffic flow caused by rehabilitation and reconstruction activities in a 5-year program by 20%.
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/48089
    Collections
    • Journal of Infrastructure Systems

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV