Show simple item record

dc.contributor.authorStephanie E. Chang
dc.contributor.authorMasanobu Shinozuka
dc.date.accessioned2017-05-08T21:21:03Z
dc.date.available2017-05-08T21:21:03Z
dc.date.copyrightSeptember 1996
dc.date.issued1996
dc.identifier.other%28asce%291076-0342%281996%292%3A3%28118%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/48022
dc.description.abstractLife-cycle cost is an important factor that should be estimated in the design and optimal management of infrastructure expected to be functional for a long period of time. In addition to initial construction cost, the estimation should include expenditures for maintenance, retrofit, and upgrading. This represents a relatively new concept whose application in the United States has been encouraged by passage of the 1991 Intermodal Surface Transportation Efficiency Act (ISTEA) for bridges. One problem associated with life-cycle cost estimation, as currently implemented, is that the costs associated with natural hazards, particularly future earthquakes, are not taken into consideration. The present paper provides a framework in which not only the initial capital and discounted maintenance cost but also the discounted cost for seismic retrofit and damage/repair cost from seismic events can be combined for a more realistic life-cycle cost estimation for bridges that are located in earthquake-prone areas. The framework provides economic insight into the various components of cost and identifies the specific information required for life-cycle cost estimation.
dc.publisherAmerican Society of Civil Engineers
dc.titleLife-Cycle Cost Analysis with Natural Hazard Risk
dc.typeJournal Paper
dc.journal.volume2
dc.journal.issue3
dc.journal.titleJournal of Infrastructure Systems
dc.identifier.doi10.1061/(ASCE)1076-0342(1996)2:3(118)
dc.treeJournal of Infrastructure Systems:;1996:;Volume ( 002 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record