• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Professional Issues in Engineering Education and Practice
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Professional Issues in Engineering Education and Practice
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Corridor Protection through NEPA

    Thumbnail
    View/Open
    %28asce%291052-3928%282006%29132%3A2%28158%29.pdf (120.6Kb)
    Date
    2006
    Author
    Michael T. Kamprath
    John S. Miller
    Metadata
    Show full item record
    Abstract
    The addition of interchanges, traffic signals, or unsignalized driveways to an arterial corridor increases crash risk and decreases travel speeds. As adjacent vacant land is developed, however, private landowners often desire direct access to the arterial route. Because the Virginia Department of Transportation has the authority to allow direct access provided no immediate adverse impact would occur, arterials in high-growth areas tend to have an increasing number of intersections as demands for direct access grow. This study investigated the feasibility of using the provisions of the National Environmental Policy Act (NEPA) to limit corridor access (e.g., grade-separated interchanges or at-grade intersections) through four administrative mechanisms: (1) including the limited access requirement as a condition in the record of decision; (2) effecting a contract (the Federal-Aid Project Agreement) that stipulates limiting access as a requirement; (3) implementing a supplemental agreement between interested parties that indicates how the character of the corridor shall be maintained; and (4) documenting the corridor-preservation conditions that remove the requirement of an Environmental Impact Statement. Factors that limit the effectiveness of these mechanisms include (1) the source of funds for the project; (2) the extent to which environmental concerns remain constant after the NEPA process is concluded; (3) the willingness of agencies to exercise the authority they are accorded through NEPA-related agreements; and (4) the passage of congressional legislation that enhances or restricts the scope of NEPA. Case studies of projects in Virginia where the NEPA process has helped preserve the characteristics of corridors show that the process may serve to raise barriers to adding access points but does not guarantee that access points may never be added.
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/47803
    Collections
    • Journal of Professional Issues in Engineering Education and Practice

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV