• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Professional Issues in Engineering Education and Practice
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Professional Issues in Engineering Education and Practice
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Contractor-Performed Quality Control: Is the Fox Guarding the Henhouse?

    Thumbnail
    View/Open
    %28asce%291052-3928%282004%29130%3A4%28255%29.pdf (44.29Kb)
    Date
    2004
    Author
    Kamyar C. Mahboub
    Donn E. Hancher
    Yuhong Wang
    Metadata
    Show full item record
    Abstract
    At the same time that state departments of transportation are allowing contractor-performed quality control, they are also concerned about using the contractor-reported data for acceptance and payment purposes. The question is, are we putting the fox in charge of guarding the chickens? To address this concern, a large number of asphalt and concrete projects in Kentucky were examined. The statistical analyses showed that for the most part there is no significant difference between the contractor-performed acceptance data and concomitant highway agency-performed verification data. This is obviously a very encouraging finding that is expected to enhance the level of trust between the contractors and highway agencies.
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/47712
    Collections
    • Journal of Professional Issues in Engineering Education and Practice

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV