• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Professional Issues in Engineering Education and Practice
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Professional Issues in Engineering Education and Practice
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    50-Year-Old Prestressed Segmental Concrete Bridges

    Thumbnail
    View/Open
    %28asce%291052-3928%282002%29128%3A2%2883%29.pdf (443.1Kb)
    Date
    2002
    Author
    Richard M. Bennett
    Mark L. Hufstetler
    Martha Carver
    Metadata
    Show full item record
    Abstract
    The first prestressed segmental concrete bridge in the United States opened to traffic was a small bridge in Madison County, Tennessee. The bridge was constructed using prestressed concrete segments and was opened to traffic in October 1950. Prestressed concrete beams were placed side by side to form the superstructure of the bridge. The construction of this bridge and several other similar prestressed concrete bridges are described herein. The existing condition of eleven prestressed concrete bridges remaining in Tennessee is given. Only minor spalling, leaching, and horizontal cracking are present in the superstructure after fifty years of service. Many of the design features introduced in this design can be found in today’s modern precast segmental concrete bridges.
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/47582
    Collections
    • Journal of Professional Issues in Engineering Education and Practice

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV