| dc.contributor.author | Henry F. Padgham | |
| dc.date.accessioned | 2017-05-08T21:18:52Z | |
| dc.date.available | 2017-05-08T21:18:52Z | |
| dc.date.copyright | April 1984 | |
| dc.date.issued | 1984 | |
| dc.identifier.other | %28asce%291052-3928%281984%29110%3A2%2881%29.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl/handle/yetl/46669 | |
| dc.description.abstract | Successful management of the public interface with large construction projects is often essential to the ultimate success of the project. The project manager, who is often illequipped in this regard, is being forced to play an important role for the owner in this area. The approaches used and lessons learned in dealing with the public interface on the Milwaukee Water Pollution Abatement Program are examined. | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | Public Performance: A New Role for the Engineer‐Manager | |
| dc.type | Journal Paper | |
| dc.journal.volume | 110 | |
| dc.journal.issue | 2 | |
| dc.journal.title | Journal of Professional Issues in Engineering | |
| dc.identifier.doi | 10.1061/(ASCE)1052-3928(1984)110:2(81) | |
| dc.tree | Journal of Professional Issues in Engineering:;1984:;Volume ( 110 ):;issue: 002 | |
| dc.contenttype | Fulltext | |