Show simple item record

dc.contributor.authorAndrew Eberhardt
dc.date.accessioned2017-05-08T21:14:21Z
dc.date.available2017-05-08T21:14:21Z
dc.date.copyrightFebruary 1990
dc.date.issued1990
dc.identifier.other%28asce%290887-3828%281990%294%3A1%2830%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/43903
dc.description.abstractThe paper describes failures, their investigations, and repair of a 108‐in. diameter buried steel water conduit. Several circumferential breaks occurred in bells in presence of longitudinal temperature stresses, numerous defects caused by substandard pipe fabricating methods and by poor erection practices. Litigations that followed involved a number of experts whose reports often contained conflicting opinions. The purpose of this paper is to present all the aspects of this technical controversy and describe repair methods used. An assessment of AWWA publications on steel pipe design and construction is also included.
dc.publisherAmerican Society of Civil Engineers
dc.title108‐In. Diameter Steel Water Conduit Failure and Assessment of AWWA Practice
dc.typeJournal Paper
dc.journal.volume4
dc.journal.issue1
dc.journal.titleJournal of Performance of Constructed Facilities
dc.identifier.doi10.1061/(ASCE)0887-3828(1990)4:1(30)
dc.treeJournal of Performance of Constructed Facilities:;1990:;Volume ( 004 ):;issue: 001
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record