• Login
    View Item 
    •   DSpace Home
    • ASME
    • Journal of Engineering for Gas Turbines and Power
    • View Item
    •   DSpace Home
    • ASME
    • Journal of Engineering for Gas Turbines and Power
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Extended Duration Operation of a Pilot-Scale Supercritical CO2 Test Loop

    Thumbnail
    View/Open
    gtp-25-1409.pdf (2.514Mb)
    Date
    2026
    Author
    Held, Timothy J.
    Sedlacko, Kyle
    Bowan, Brett
    Miller, Jason
    Avadhanula, Vamshi
    Fry, Andrew
    Schooff, Brian
    Metadata
    Show full item record
    Abstract
    Abstract. Supercritical carbon dioxide (sCO2) power cycles offer significant advantages over steam and organic Rankine cycles particularly for high-temperature thermal input, but remain a relatively new technology with limited extended duration operations and testing experience. As part of a test of a solid-fueled heater system, a simple recuperated sCO2 test system was designed, built, and installed at the Utah San Rafael Energy Laboratory for extended test operations. The system design parameters included a maximum pressure of 20 MPa, a maximum primary heater discharge temperature of 600 °C, and a design CO2 flowrate of 5 kg/s. The design point thermal input from the fired heater to the CO2 working fluid was 1.2 MW. Residual heat rejection to the environment was via evaporative water cooling using a conventional cooling tower, and the CO2 to water heat exchanger was of the diffusion-bonded heat exchanger (DBHE) type. The recuperator was of similar design, while the primary heat exchanger (PHX) was similar to a tangent tube fired boiler design, while the heat source was alternately coal, biomass, and natural gas. The primary purpose of the test campaign was the demonstration of the fired heater—thus a work-extraction turbine was not included in the system for simplicity. A variable area throttle valve was used to control the system flow and pressure, allowing for more flexible operation than possible with a fixed geometry turbine. A robust closed-loop control system was designed for the test system permitting unattended fully automated operations. During the test campaign, extended-duration fired testing in excess of 200 h of continuous operation was successfully achieved including several switches between gas and solid fuels, and variation in firing rate.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4316570
    Collections
    • Journal of Engineering for Gas Turbines and Power

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV