| dc.contributor.author | Liu, Jia | |
| dc.contributor.author | Chen, Jianwei | |
| dc.contributor.author | Tian, Jiefang | |
| dc.contributor.author | Li, Yang | |
| dc.date.accessioned | 2026-08-20T21:36:52Z | |
| dc.date.available | 2026-08-20T21:36:52Z | |
| dc.date.copyright | 2025/09/18 | |
| dc.date.issued | 2025 | |
| dc.identifier.other | JCEMD4.COENG-16722.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4314737 | |
| dc.description.abstract | AbstractThe multimode resource-constrained project scheduling problem (MRCPSP) is recognized
as a well-known NP-hard combinatorial optimization problem. It incorporates both renewable
and nonrenewable resources, along with multiple modes of each task, ... | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | An Efficient Random Key–Based Genetic Algorithm for Solving Multimode Resource-Constrained Project Scheduling Problem | |
| dc.type | Journal Article | |
| dc.journal.volume | 151 | |
| dc.journal.issue | 12 | |
| dc.journal.title | Journal of Construction Engineering and Management | |
| dc.identifier.doi | 10.1061/JCEMD4.COENG-16722 | |
| dc.journal.fristpage | 04025193-1 | |
| dc.journal.lastpage | 04025193-12 | |
| dc.page | 12 | |
| dc.tree | Journal of Construction Engineering and Management:;2025:;Volume ( 151 ):;issue: 012 | |
| dc.contenttype | Fulltext | |