| dc.contributor.author | Shiha, Ahmed | |
| dc.contributor.author | El-adaway, Islam H. | |
| dc.date.accessioned | 2026-08-20T21:36:37Z | |
| dc.date.available | 2026-08-20T21:36:37Z | |
| dc.date.copyright | 2025/09/24 | |
| dc.date.issued | 2025 | |
| dc.identifier.other | JCEMD4.COENG-16650.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4314731 | |
| dc.description.abstract | AbstractAs a major input to several work packages, the labor element constitutes a critical
component for successful performance of construction projects. Localized labor shortages,
fundamental changes in prevailing wage laws, and historical shifts in the ... | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | Forecasting State-Level Construction Labor Earnings for Enhanced Project Cost Control: An Econometric and Deep-Learning Analysis of the Leading Economic Indicators | |
| dc.type | Journal Article | |
| dc.journal.volume | 151 | |
| dc.journal.issue | 12 | |
| dc.journal.title | Journal of Construction Engineering and Management | |
| dc.identifier.doi | 10.1061/JCEMD4.COENG-16650 | |
| dc.journal.fristpage | 04025198-1 | |
| dc.journal.lastpage | 04025198-25 | |
| dc.page | 25 | |
| dc.tree | Journal of Construction Engineering and Management:;2025:;Volume ( 151 ):;issue: 012 | |
| dc.contenttype | Fulltext | |