Show simple item record

dc.contributor.authorBhatia, Angat
dc.contributor.authorMoselhi, Osama
dc.contributor.authorHan, SangHyeok
dc.date.accessioned2026-08-20T21:36:04Z
dc.date.available2026-08-20T21:36:04Z
dc.date.copyright2025/06/05
dc.date.issued2025
dc.identifier.otherJCEMD4.COENG-16565.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4314716
dc.description.abstractAbstractPanelized construction refers to a building method where structural components such as wall, floor, and roof panels are prefabricated in a factory environment and then transported to the construction site for assembly. Panelized construction ...
dc.publisherAmerican Society of Civil Engineers
dc.titleHybrid Optimization Approach for Scheduling in Panelized Construction Manufacturing
dc.typeJournal Article
dc.journal.volume151
dc.journal.issue8
dc.journal.titleJournal of Construction Engineering and Management
dc.identifier.doi10.1061/JCEMD4.COENG-16565
dc.journal.fristpage04025107-1
dc.journal.lastpage04025107-14
dc.page14
dc.treeJournal of Construction Engineering and Management:;2025:;Volume ( 151 ):;issue: 008
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record