| dc.contributor.author | Mhady, Ahmed Abo | |
| dc.contributor.author | Gurgun, Asli Pelin | |
| dc.contributor.author | Budayan, Cenk | |
| dc.contributor.author | Koc, Kerim | |
| dc.date.accessioned | 2026-08-20T21:35:40Z | |
| dc.date.available | 2026-08-20T21:35:40Z | |
| dc.date.copyright | 2025/08/18 | |
| dc.date.issued | 2025 | |
| dc.identifier.other | JCEMD4.COENG-16487.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4314705 | |
| dc.description.abstract | AbstractIn the construction industry, project performance often faces challenges due to the
unpredictable nature of operational environments, causing construction projects to
frequently exceed their estimated initial budget. Construction companies must ... | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | New Hybrid Models Integrating the Firefly Optimization Algorithm with the Artificial Neural Networks and Adaptive Neuro-Fuzzy Inference Systems to Improve Estimation at Completion | |
| dc.type | Journal Article | |
| dc.journal.volume | 151 | |
| dc.journal.issue | 11 | |
| dc.journal.title | Journal of Construction Engineering and Management | |
| dc.identifier.doi | 10.1061/JCEMD4.COENG-16487 | |
| dc.journal.fristpage | 04025160-1 | |
| dc.journal.lastpage | 04025160-19 | |
| dc.page | 19 | |
| dc.tree | Journal of Construction Engineering and Management:;2025:;Volume ( 151 ):;issue: 011 | |
| dc.contenttype | Fulltext | |