Show simple item record

dc.contributor.authorZhang, Feng
dc.contributor.authorHan, Hao-Zhe
dc.contributor.authorYu, Yang
dc.contributor.authorWang, Cheng-Shu
dc.contributor.authorXu, Shuo
dc.date.accessioned2026-08-20T21:21:08Z
dc.date.available2026-08-20T21:21:08Z
dc.date.copyright2025/12/03
dc.date.issued2026
dc.identifier.otherJBENF2.BEENG-7749.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4314327
dc.description.abstractAbstract To study the temperature field in a three-cell concrete box girder, an on-site testing model was constructed. One hundred and fifty-one temperature sensors were embedded in the model, and temperature monitoring was carried out for a duration of ...
dc.publisherAmerican Society of Civil Engineers
dc.titleTesting and Analysis of Temperature Field in a Three-Cell Concrete Box Girder Model
dc.typeJournal Article
dc.journal.volume31
dc.journal.issue2
dc.journal.titleJournal of Bridge Engineering
dc.identifier.doi10.1061/JBENF2.BEENG-7749
dc.journal.fristpage04025104-1
dc.journal.lastpage04025104-20
dc.page20
dc.treeJournal of Bridge Engineering:;2026:;Volume ( 031 ):;issue: 002
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record