Analytical Solutions and Parameter Sensitivity of Construction Disturbance–Induced Settlement of a Prefabricated Underground Station
View/ Open
Date
2026Author
Lin, Siyan
Ali, Shuban
Hong, Chengyu
Ali, Mutahar
Zhang, Xiuxing
Guo, Ping
Metadata
Show full item recordAbstract
Abstract During the construction of prefabricated underground stations (PUSs), adverse geological
conditions and external loads can cause deformation and misalignment of the station
rings. Previous models treat PUS as a continuous beam, neglecting the ...