| dc.contributor.author | Davies, Matthew P. | |
| dc.contributor.author | Young, David L. | |
| dc.contributor.author | Scully, Brandan M. | |
| dc.contributor.author | Bain, Rachel L. | |
| dc.contributor.author | Kress, Marin M. | |
| dc.contributor.author | Chen, Jiannan | |
| dc.contributor.author | Zhan, Weiwei | |
| dc.date.accessioned | 2026-08-20T21:03:35Z | |
| dc.date.available | 2026-08-20T21:03:35Z | |
| dc.date.copyright | 2026/01/23 | |
| dc.date.issued | 2026 | |
| dc.identifier.other | JWPED5.WWENG-2368.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4313887 | |
| dc.description.abstract | Abstract The USACE traditionally uses regular exam, before dredge, and after dredge hydrographic
surveys and/or survey volume reports to estimate needed dredge material volume(s)
to return federal navigation channels to authorized or maintained ... | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | Volume to Dredge: Right-Sizing Dredging Based on Vessel Demand in USACE’s South Atlantic Division | |
| dc.type | Journal Article | |
| dc.journal.volume | 152 | |
| dc.journal.issue | 3 | |
| dc.journal.title | Journal of Waterway, Port, Coastal, and Ocean Engineering | |
| dc.identifier.doi | 10.1061/JWPED5.WWENG-2368 | |
| dc.journal.fristpage | 04026003-1 | |
| dc.journal.lastpage | 04026003-12 | |
| dc.page | 12 | |
| dc.tree | Journal of Waterway, Port, Coastal, and Ocean Engineering:;2026:;Volume ( 152 ):;issue: 003 | |
| dc.contenttype | Fulltext | |