Show simple item record

dc.contributor.authorLi, Linjing
dc.contributor.authorWeng, Xiaolin
dc.contributor.authorPang, Guowei
dc.contributor.authorXu, Jiangbo
dc.contributor.authorYu, Bangyou
dc.contributor.authorLi, Xuancong
dc.date.accessioned2026-08-20T20:54:03Z
dc.date.available2026-08-20T20:54:03Z
dc.date.copyright2026/02/04
dc.date.issued2026
dc.identifier.otherIJGNAI.GMENG-12349.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4313641
dc.description.abstractAbstract To investigate the mechanical response of surrounding rocks and existing bridges during shield tunnel construction, this study relied on the Guangzhou Electric Power Shield Tunnel Project. The 1g scaling test and numerical analysis method are ...
dc.publisherAmerican Society of Civil Engineers
dc.titleResearch on the Mechanical Response of Shield Side–Crossing Construction on Surrounding Rocks and Existing Bridges
dc.typeJournal Article
dc.journal.volume26
dc.journal.issue4
dc.journal.titleInternational Journal of Geomechanics
dc.identifier.doi10.1061/IJGNAI.GMENG-12349
dc.journal.fristpage04026042-1
dc.journal.lastpage04026042-11
dc.page11
dc.treeInternational Journal of Geomechanics:;2026:;Volume ( 026 ):;issue: 004
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record