Show full item recordAbstract
AbstractTypically, earthquake-damaged reinforced concrete (RC) building components are fully
repaired with epoxy injection into every crack wider than 0.2 mm to achieve the highest
performance recovery. However, this repair objective may not be necessary ...Practical ApplicationsPractical applications for this paper are focused on determining the ability to achieve
seismic performance objectives of an earthquake-damaged concrete frame building while
saving costs by only repairing a portion of the plastic ...