| dc.contributor.author | Rao, N. Prasad | |
| dc.contributor.author | Balagopal, R. | |
| dc.contributor.author | Rokade, R. P. | |
| dc.contributor.author | Palani, G. S. | |
| dc.date.accessioned | 2026-08-20T12:08:55Z | |
| dc.date.available | 2026-08-20T12:08:55Z | |
| dc.date.copyright | 2025/03/27 | |
| dc.date.issued | 2025 | |
| dc.identifier.other | JSDCCC.SCENG-1721.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4313151 | |
| dc.description.abstract | AbstractTransmission line (TL) towers may fail prematurely during mandatory testing for many
reasons, even though they were designed based on the provisions of different standards.
Five premature failures observed during full-scale testing at the Tower ...Practical ApplicationsThe reasons for the premature failure of transmission line towers during prototype
testing are discussed. The reasons for failure are categorized as failure due to inadequate
redundant patterns in design and failure due to improper ... | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | Detailing Redundant Pattern–Induced Failures in Transmission Line Towers | |
| dc.type | Journal Article | |
| dc.journal.volume | 30 | |
| dc.journal.issue | 3 | |
| dc.journal.title | Journal of Structural Design and Construction Practice | |
| dc.identifier.doi | 10.1061/JSDCCC.SCENG-1721 | |
| dc.journal.fristpage | 04025035-1 | |
| dc.journal.lastpage | 04025035-12 | |
| dc.page | 12 | |
| dc.tree | Journal of Structural Design and Construction Practice:;2025:;Volume ( 030 ):;issue: 003 | |
| dc.contenttype | Fulltext | |