| dc.contributor.author | Shi, Jing-kang | |
| dc.contributor.author | Huang, Hong-wei | |
| dc.contributor.author | Zhou, Bo-han | |
| dc.contributor.author | Guan, Zhen-chang | |
| dc.date.accessioned | 2026-08-20T12:03:51Z | |
| dc.date.available | 2026-08-20T12:03:51Z | |
| dc.date.copyright | 2025/07/24 | |
| dc.date.issued | 2025 | |
| dc.identifier.other | AJRUA6.RUENG-1610.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4313047 | |
| dc.description.abstract | AbstractThe construction of twin tunnels excavated by simultaneous drive of two opposite tunnel
boring machines presents a challenge for the tunneling industry, in particular the
assurance of tunnel face stability due to a mutual effect when both tunnels ... | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | Face Stability of Twin Tunnels Excavated in Opposite Directions Using Large-Diameter Slurry Shield Machines | |
| dc.type | Journal Article | |
| dc.journal.volume | 11 | |
| dc.journal.issue | 4 | |
| dc.journal.title | ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering | |
| dc.identifier.doi | 10.1061/AJRUA6.RUENG-1610 | |
| dc.journal.fristpage | 04025058-1 | |
| dc.journal.lastpage | 04025058-12 | |
| dc.page | 12 | |
| dc.tree | ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering:;2025:;Volume ( 011 ):;issue: 004 | |
| dc.contenttype | Fulltext | |