| dc.contributor.author | Sun, Yang | |
| dc.contributor.author | Xu, Youzhe | |
| dc.contributor.author | Tan, Junwei | |
| dc.contributor.author | Song, Dewei | |
| dc.contributor.author | Xu, Zhenyang | |
| dc.contributor.author | Yang, Pan | |
| dc.date.accessioned | 2026-08-20T11:57:27Z | |
| dc.date.available | 2026-08-20T11:57:27Z | |
| dc.date.copyright | 2025/08/28 | |
| dc.date.issued | 2025 | |
| dc.identifier.other | JPCFEV.CFENG-4337.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4312896 | |
| dc.description.abstract | AbstractIn this paper, the previous construction process, water inrush conditions, mechanism
of water inrush, and accident treatment measures of abandoned pile 204# of the Jiangbei
Central Business District (Jiangbei CBD) in Nanjing, China, are introduced ...Practical ApplicationsIn September 2018, during the construction of a large deep foundation pit in the central
area of Jiangbei in Nanjing, a confined water inrush accident occurred, and water
in the confined aquifer continued to gush out through the pile ... | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | Analysis of a Water Inrush Accident in a Deep Foundation Pit Caused by an Abandoned Pile and Its Treatment Measures | |
| dc.type | Journal Article | |
| dc.journal.volume | 39 | |
| dc.journal.issue | 6 | |
| dc.journal.title | Journal of Performance of Constructed Facilities | |
| dc.identifier.doi | 10.1061/JPCFEV.CFENG-4337 | |
| dc.journal.fristpage | 04025054-1 | |
| dc.journal.lastpage | 04025054-14 | |
| dc.page | 14 | |
| dc.tree | Journal of Performance of Constructed Facilities:;2025:;Volume ( 039 ):;issue: 006 | |
| dc.contenttype | Fulltext | |