Transient Groundwater Response to Pumping in a Confined Aquifer during Deep Circular Excavation Dewatering
Abstract
Abstract Vertical circular excavations are widely used in practical engineering due to their
higher structural stiffness and construction efficiency compared with other plan geometries.
The dewatering well and partial penetration cutoff wall are ...