Show simple item record

dc.contributor.authorWang, Xumin
dc.contributor.authorKai, Kang
dc.date.accessioned2026-08-20T11:15:33Z
dc.date.available2026-08-20T11:15:33Z
dc.date.copyright2026/05/24
dc.date.issued2026
dc.identifier.otherJLADAH.LADR-1463.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4311928
dc.description.abstractAbstractThe engineering–procurement–construction (EPC) model has been widely adopted in construction practice for its ability to achieve efficient integration and unified coordination across project phases. However, the diversity and complexity of cost ...Practical ApplicationsThis study provides a data-driven approach to identifying and managing cost risks in engineering-procurement-construction projects throughout their entire life cycle. Based on 212 legal cases from China, the research systematically ...
dc.publisherAmerican Society of Civil Engineers
dc.titleKey Factors and Transmission Mechanisms ofCost Risk in General Engineering ContractingProjects Based on Legal Cases
dc.typeJournal Article
dc.journal.volume18
dc.journal.issue3
dc.journal.titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
dc.identifier.doi10.1061/JLADAH.LADR-1463
dc.journal.fristpage04526031-1
dc.journal.lastpage04526031-14
dc.page14
dc.treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2026:;Volume ( 018 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record