| dc.description.abstract | AbstractConstruction projects are the engines of a thriving economy. However, it is well-known
that the sector is marred by perennial delays impacting the public exchequer. Many
studies have suggested solutions to prevent delays and resolve disputes ... | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | Construction Contractors and Concurrent Delays: Contractual Requirements and Mapping with Lean Construction Principles | |
| dc.type | Journal Article | |
| dc.journal.volume | 17 | |
| dc.journal.issue | 4 | |
| dc.journal.title | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction | |
| dc.identifier.doi | 10.1061/JLADAH.LADR-1398 | |
| dc.journal.fristpage | 04525066-1 | |
| dc.journal.lastpage | 04525066-14 | |
| dc.page | 14 | |
| dc.tree | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2025:;Volume ( 017 ):;issue: 004 | |
| dc.contenttype | Fulltext | |