A Fuzzy AHP Model to Examine the Causes of Disputes in the Construction Industry
| dc.contributor.author | Irlayici Cakmak, Pinar | |
| dc.date.accessioned | 2026-08-20T11:14:17Z | |
| dc.date.available | 2026-08-20T11:14:17Z | |
| dc.date.copyright | 2025/09/23 | |
| dc.date.issued | 2026 | |
| dc.identifier.other | JLADAH.LADR-1358.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4311894 | |
| dc.description.abstract | AbstractDisputes pose serious risks for the project participants, and if not appropriately managed, disputes cause significant delays, financial losses, and damage to relationships between the parties. This study aims to systematically identify, analyze, ...Practical ApplicationsDisputes in construction projects can lead to costly delays, legal conflicts, and strained stakeholder relationships. This study applies the fuzzy AHP to systematically identify and rank the key factors contributing to disputes, ... | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | A Fuzzy AHP Model to Examine the Causes of Disputes in the Construction Industry | |
| dc.type | Journal Article | |
| dc.journal.volume | 18 | |
| dc.journal.issue | 1 | |
| dc.journal.title | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction | |
| dc.identifier.doi | 10.1061/JLADAH.LADR-1358 | |
| dc.journal.fristpage | 04525073-1 | |
| dc.journal.lastpage | 04525073-11 | |
| dc.page | 11 | |
| dc.tree | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2026:;Volume ( 018 ):;issue: 001 | |
| dc.contenttype | Fulltext |