| dc.contributor.author | Husam, Syed | |
| dc.contributor.author | Viswanathan, Satish Kumar | |
| dc.contributor.author | Saikia, Sudarshan | |
| dc.contributor.author | Johari, Sparsh | |
| dc.date.accessioned | 2026-08-20T11:13:15Z | |
| dc.date.available | 2026-08-20T11:13:15Z | |
| dc.date.copyright | 2025/06/26 | |
| dc.date.issued | 2025 | |
| dc.identifier.other | JLADAH.LADR-1286.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4311866 | |
| dc.description.abstract | AbstractDuring the COVID-19 pandemic, various preventive measures, such as social distancing
and restrictions on gathering workers, were taken on construction sites. Such a situation
leads to a changed working environment for construction workers. As the ...Practical ApplicationsThe results of this study pave the way for exploring the adoption of COVID-19 precautionary
measures as regular practice during the on-site pandemic to improve workers’ performance.
Furthermore, precautionary measures that the ... | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | Effect of COVID-19 Precautionary Measures on Construction Labor Productivity | |
| dc.type | Journal Article | |
| dc.journal.volume | 17 | |
| dc.journal.issue | 4 | |
| dc.journal.title | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction | |
| dc.identifier.doi | 10.1061/JLADAH.LADR-1286 | |
| dc.journal.fristpage | 04525054-1 | |
| dc.journal.lastpage | 04525054-13 | |
| dc.page | 13 | |
| dc.tree | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2025:;Volume ( 017 ):;issue: 004 | |
| dc.contenttype | Fulltext | |