Show simple item record

dc.contributor.authorZhao, Tong
dc.date.accessioned2026-08-20T11:13:05Z
dc.date.available2026-08-20T11:13:05Z
dc.date.copyright2025/03/24
dc.date.issued2025
dc.identifier.otherJLADAH.LADR-1260.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4311861
dc.description.abstractAbstractLost productivity is a common cause of cost overrun on construction projects and often results in construction claims. There are several different loss of productivity quantification methods and variants of those methods. Due to lack of adequate ...
dc.publisherAmerican Society of Civil Engineers
dc.titleToward a Rigorous Classification of Loss of Productivity Quantification Methods
dc.typeJournal Article
dc.journal.volume17
dc.journal.issue3
dc.journal.titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
dc.identifier.doi10.1061/JLADAH.LADR-1260
dc.journal.fristpage04525010-1
dc.journal.lastpage04525010-12
dc.page12
dc.treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2025:;Volume ( 017 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record