| dc.contributor.author | Wu, Xuelian | |
| dc.contributor.author | Shi, Xiaoli | |
| dc.contributor.author | Gong, Xiaotian | |
| dc.contributor.author | Ji, Xiaoping | |
| dc.date.accessioned | 2026-08-20T11:11:46Z | |
| dc.date.available | 2026-08-20T11:11:46Z | |
| dc.date.copyright | 2025/11/03 | |
| dc.date.issued | 2026 | |
| dc.identifier.other | JITSE4.ISENG-2746.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4311827 | |
| dc.description.abstract | AbstractPerformance-based maintenance contracting (PBMC) is considered superior to traditional
contracting methods in managing cost, schedule, and quality. Previous studies mainly
focused on performance indicators development, and there is a lack of ... | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | Understanding the Affecting Factors and Effectiveness Indicators of Bundled Performance-Based Maintenance Contracting | |
| dc.type | Journal Article | |
| dc.journal.volume | 32 | |
| dc.journal.issue | 1 | |
| dc.journal.title | Journal of Infrastructure Systems | |
| dc.identifier.doi | 10.1061/JITSE4.ISENG-2746 | |
| dc.journal.fristpage | 04025040-1 | |
| dc.journal.lastpage | 04025040-17 | |
| dc.page | 17 | |
| dc.tree | Journal of Infrastructure Systems:;2026:;Volume ( 032 ):;issue: 001 | |
| dc.contenttype | Fulltext | |