A Multitower Crane Layout Planning Framework for Modular Integrated Construction Considering Material Relay Handling
View/ Open
Date
2026Author
Zhang, Jingfeng
Wang, Ying
Wang, Roy Dong
Li, Xiao
Zhang, Zenan
Yang, Zhenning
Metadata
Show full item recordAbstract
AbstractTransfer zones play a vital role in multitower crane construction sites as they alleviate
on-site logistics bottlenecks by facilitating material relay handling. However, lifting
operations within these zones are prone to crane collisions, ...