| dc.contributor.author | Kim, Sooin | |
| dc.contributor.author | Liang, Yunping | |
| dc.date.accessioned | 2026-08-20T10:43:41Z | |
| dc.date.available | 2026-08-20T10:43:41Z | |
| dc.date.copyright | 2026/04/25 | |
| dc.date.issued | 2026 | |
| dc.identifier.other | JCEMD4.COENG-17715.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4311179 | |
| dc.description.abstract | AbstractHighway construction cost inflation has reached historic highs, outpaced overall inflation,
and significantly eroded the purchasing power of planned funding. Little empirical
research has differentiated inflation types, i.e., demand-pull, cost-... | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | Dissecting Highway Construction Cost Inflation: A Two-Decade Analysis of Inflation Types Using the National Highway Construction Cost Index | |
| dc.type | Journal Article | |
| dc.journal.volume | 152 | |
| dc.journal.issue | 7 | |
| dc.journal.title | Journal of Construction Engineering and Management | |
| dc.identifier.doi | 10.1061/JCEMD4.COENG-17715 | |
| dc.journal.fristpage | 04026087-1 | |
| dc.journal.lastpage | 04026087-20 | |
| dc.page | 20 | |
| dc.tree | Journal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 007 | |
| dc.contenttype | Fulltext | |