| dc.contributor.author | Yi, Wen | |
| dc.contributor.author | Wang, Huiwen | |
| dc.contributor.author | Zhen, Lu | |
| dc.contributor.author | Song, Yongze | |
| dc.contributor.author | Xiao, Bo | |
| dc.date.accessioned | 2026-08-20T10:43:05Z | |
| dc.date.available | 2026-08-20T10:43:05Z | |
| dc.date.copyright | 2026/02/23 | |
| dc.date.issued | 2026 | |
| dc.identifier.other | JCEMD4.COENG-17572.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4311165 | |
| dc.description.abstract | AbstractModular construction (MC) is a sustainable construction method; however, its extensive
adoption is hindered by challenges in logistics planning and coordination. Recognizing
this barrier, many governments are planning the deployment of modular ... | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | Strategic Planning of Modular Construction Hubs: A Bilevel Framework Integrating Governmental and Industrial Perspectives | |
| dc.type | Journal Article | |
| dc.journal.volume | 152 | |
| dc.journal.issue | 5 | |
| dc.journal.title | Journal of Construction Engineering and Management | |
| dc.identifier.doi | 10.1061/JCEMD4.COENG-17572 | |
| dc.journal.fristpage | 04026034-1 | |
| dc.journal.lastpage | 04026034-15 | |
| dc.page | 15 | |
| dc.tree | Journal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 005 | |
| dc.contenttype | Fulltext | |