| dc.contributor.author | Zabihi Kolaei, Ali | |
| dc.contributor.author | Khanzadi, Mostafa | |
| dc.contributor.author | Ghodrati Amiri, Gholamreza | |
| dc.date.accessioned | 2026-08-20T10:42:40Z | |
| dc.date.available | 2026-08-20T10:42:40Z | |
| dc.date.copyright | 2025/11/24 | |
| dc.date.issued | 2026 | |
| dc.identifier.other | JCEMD4.COENG-17504.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4311155 | |
| dc.description.abstract | AbstractConstruction projects will inevitably experience changes and modifications, which
frequently result in disputes and interruptions. Despite the fact that the construction
industry has made progress, the approaches that are now being used to manage ... | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | Integration of Augmented Reality and Blockchain Technologies for Visualizing and Documenting Change Orders in a Building Project: Case Study | |
| dc.type | Journal Article | |
| dc.journal.volume | 152 | |
| dc.journal.issue | 2 | |
| dc.journal.title | Journal of Construction Engineering and Management | |
| dc.identifier.doi | 10.1061/JCEMD4.COENG-17504 | |
| dc.journal.fristpage | 04025251-1 | |
| dc.journal.lastpage | 04025251-12 | |
| dc.page | 12 | |
| dc.tree | Journal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 002 | |
| dc.contenttype | Fulltext | |