| dc.contributor.author | Liu, Wei | |
| dc.contributor.author | Feng, Zhongyi | |
| dc.contributor.author | Luo, Xiao | |
| dc.date.accessioned | 2026-08-20T10:42:38Z | |
| dc.date.available | 2026-08-20T10:42:38Z | |
| dc.date.copyright | 2026/03/30 | |
| dc.date.issued | 2026 | |
| dc.identifier.other | JCEMD4.COENG-17500.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4311154 | |
| dc.description.abstract | AbstractTo explore and construct a scientific and effective mechanism of risk-sharing in the
prefabricated building project supply chain (PBPSC), this study analyzed the main
risks faced by each unit in the project supply chain (SC), established a risk-... | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | Study of a Risk-Sharing Mechanism in a Prefabricated Building Project Supply Chain | |
| dc.type | Journal Article | |
| dc.journal.volume | 152 | |
| dc.journal.issue | 6 | |
| dc.journal.title | Journal of Construction Engineering and Management | |
| dc.identifier.doi | 10.1061/JCEMD4.COENG-17500 | |
| dc.journal.fristpage | 04026063-1 | |
| dc.journal.lastpage | 04026063-16 | |
| dc.page | 16 | |
| dc.tree | Journal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 006 | |
| dc.contenttype | Fulltext | |