| dc.contributor.author | Lin, Zhiyang | |
| dc.contributor.author | Petzold, Frank | |
| dc.contributor.author | Ma, Zhiliang | |
| dc.date.accessioned | 2026-08-20T10:42:20Z | |
| dc.date.available | 2026-08-20T10:42:20Z | |
| dc.date.copyright | 2026/01/23 | |
| dc.date.issued | 2026 | |
| dc.identifier.other | JCEMD4.COENG-17374.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4311146 | |
| dc.description.abstract | AbstractTower cranes have significant impacts on construction projects, such as safety and
schedule. Ineffective operation navigation can fail tower crane operations, leading
to efficiency and safety issues. Existing research only investigated the reasons ... | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | Uncovering the Timeline Hidden in Tower Crane Operation Navigation for Better Lifting Activities in Construction Site | |
| dc.type | Journal Article | |
| dc.journal.volume | 152 | |
| dc.journal.issue | 4 | |
| dc.journal.title | Journal of Construction Engineering and Management | |
| dc.identifier.doi | 10.1061/JCEMD4.COENG-17374 | |
| dc.journal.fristpage | 04026011-1 | |
| dc.journal.lastpage | 04026011-15 | |
| dc.page | 15 | |
| dc.tree | Journal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 004 | |
| dc.contenttype | Fulltext | |