| dc.contributor.author | Piyush, null | |
| dc.contributor.author | Rajak, Ph.D., Sonu | |
| dc.contributor.author | K. E. K., Ph.D., Vimal | |
| dc.date.accessioned | 2026-08-20T10:42:07Z | |
| dc.date.available | 2026-08-20T10:42:07Z | |
| dc.date.copyright | 2026/04/14 | |
| dc.date.issued | 2026 | |
| dc.identifier.other | JCEMD4.COENG-17359.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4311143 | |
| dc.description.abstract | AbstractDelays in engineering, procurement, and construction (EPC) projects lead to disputes
and cost overruns, exacerbated by the shortcomings of traditional time impact analysis
(TIA) in transparency, security, and sustainability. This study introduces ... | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | Blockchain-Based Time Impact Analysis Method for Sustainable Delay Management in EPC Projects | |
| dc.type | Journal Article | |
| dc.journal.volume | 152 | |
| dc.journal.issue | 6 | |
| dc.journal.title | Journal of Construction Engineering and Management | |
| dc.identifier.doi | 10.1061/JCEMD4.COENG-17359 | |
| dc.journal.fristpage | 04026074-1 | |
| dc.journal.lastpage | 04026074-20 | |
| dc.page | 20 | |
| dc.tree | Journal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 006 | |
| dc.contenttype | Fulltext | |