| dc.contributor.author | Safikhani, Sara | |
| dc.contributor.author | Shafaat, Ali | |
| dc.contributor.author | Sartipipour, Mohsen | |
| dc.date.accessioned | 2026-08-20T10:41:59Z | |
| dc.date.available | 2026-08-20T10:41:59Z | |
| dc.date.copyright | 2026/04/06 | |
| dc.date.issued | 2026 | |
| dc.identifier.other | JCEMD4.COENG-17332.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4311140 | |
| dc.description.abstract | AbstractThis paper introduces an automated project scheduling framework tailored to the complexities
of construction environments, with a particular emphasis on preemptive activity splitting.
The proposed method builds on the preemptive multi-mode ... | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | Automated Project Rescheduling with Preemptive Activity Splitting for Baseline Restoration | |
| dc.type | Journal Article | |
| dc.journal.volume | 152 | |
| dc.journal.issue | 6 | |
| dc.journal.title | Journal of Construction Engineering and Management | |
| dc.identifier.doi | 10.1061/JCEMD4.COENG-17332 | |
| dc.journal.fristpage | 04026065-1 | |
| dc.journal.lastpage | 04026065-15 | |
| dc.page | 15 | |
| dc.tree | Journal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 006 | |
| dc.contenttype | Fulltext | |