| dc.description.abstract | AbstractOptimally balancing project duration and cost significantly enhances overall project
value. Nevertheless, managing this dual-objective optimization becomes increasingly
challenging as the number of activities and their associated execution modes ... | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | Project Scheduling to Minimize the Time and Cost in Large-Scale Construction Projects with Repulsion-Based Improved Arithmetic Optimization | |
| dc.type | Journal Article | |
| dc.journal.volume | 152 | |
| dc.journal.issue | 3 | |
| dc.journal.title | Journal of Construction Engineering and Management | |
| dc.identifier.doi | 10.1061/JCEMD4.COENG-17269 | |
| dc.journal.fristpage | 04025277-1 | |
| dc.journal.lastpage | 04025277-19 | |
| dc.page | 19 | |
| dc.tree | Journal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 003 | |
| dc.contenttype | Fulltext | |