Show simple item record

dc.contributor.authorYang, Zhongze
dc.contributor.authorLu, Weisheng
dc.contributor.authorWu, Liupengfei
dc.contributor.authorXu, Jinying
dc.date.accessioned2026-08-20T10:41:25Z
dc.date.available2026-08-20T10:41:25Z
dc.date.copyright2026/05/27
dc.date.issued2026
dc.identifier.otherJCEMD4.COENG-17200.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4311127
dc.description.abstractAbstractWorkflow variability is a classic management challenge that could seriously impede production or project performance. However, there are sporadic efforts to analyze it in modular integrated construction (MiC), particularly its off-site ...
dc.publisherAmerican Society of Civil Engineers
dc.titleAnalysis of Workflow Variability in Modular Integrated Construction Manufacturing Using Cooperative Game Theory
dc.typeJournal Article
dc.journal.volume152
dc.journal.issue8
dc.journal.titleJournal of Construction Engineering and Management
dc.identifier.doi10.1061/JCEMD4.COENG-17200
dc.journal.fristpage04026115-1
dc.journal.lastpage04026115-12
dc.page12
dc.treeJournal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 008
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record