| dc.contributor.author | Wang, Jun | |
| dc.contributor.author | Qu, Ziyi | |
| dc.contributor.author | Skitmore, Martin | |
| dc.date.accessioned | 2026-08-20T10:41:04Z | |
| dc.date.available | 2026-08-20T10:41:04Z | |
| dc.date.copyright | 2025/11/03 | |
| dc.date.issued | 2026 | |
| dc.identifier.other | JCEMD4.COENG-17141.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4311118 | |
| dc.description.abstract | AbstractThe Construction Cost Index (CCI), published monthly by Engineering News-Record in the US, has fluctuations that create significant challenges in cost estimation,
bid preparation, and investment planning. Accurate forecasting of the CCI is ...Practical ApplicationsAccurate CCI forecasting with the hybrid VMD-GRU-MHSA framework brings significant
value to the construction industry. It provides a robust and flexible solution for
predicting various nonlinear and nonstationary time series indices ... | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | Predicting Construction Cost Index Using a VMD-GRU Framework with the MHSA Mechanism | |
| dc.type | Journal Article | |
| dc.journal.volume | 152 | |
| dc.journal.issue | 1 | |
| dc.journal.title | Journal of Construction Engineering and Management | |
| dc.identifier.doi | 10.1061/JCEMD4.COENG-17141 | |
| dc.journal.fristpage | 04025236-1 | |
| dc.journal.lastpage | 04025236-13 | |
| dc.page | 13 | |
| dc.tree | Journal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 001 | |
| dc.contenttype | Fulltext | |