dc.contributor.authorAlmalki, Mohammed
dc.contributor.authorSalman, Baris
dc.contributor.authorSalem, Ossama
dc.contributor.authorAmmoury, Michael
dc.date.accessioned2026-08-20T10:40:04Z
dc.date.available2026-08-20T10:40:04Z
dc.date.copyright2025/12/17
dc.date.issued2026
dc.identifier.otherJCEMD4.COENG-16962.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4311095
dc.description.abstractAbstractOpen-cut construction, the traditional construction method for wastewater pipeline projects, often leads to significant inefficiencies, lengthy delays, and substantial social and environmental impacts. This study proposes a decision support ...Practical ApplicationsDelivering wastewater pipeline projects on time and with minimal disruption is a growing priority for agencies and contractors, especially in dense urban areas. Traditional open-cut methods often result in high costs, long delays, ...
dc.publisherAmerican Society of Civil Engineers
dc.titleA Decision-Support Framework for Accelerated Wastewater Pipeline Construction: Integrating Economic, Social, Environmental, and Technical Criteria
dc.typeJournal Article
dc.journal.volume152
dc.journal.issue3
dc.journal.titleJournal of Construction Engineering and Management
dc.identifier.doi10.1061/JCEMD4.COENG-16962
dc.journal.fristpage04025263-1
dc.journal.lastpage04025263-15
dc.page15
dc.treeJournal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 003
dc.contenttypeFulltext